AME have successfully completed a project to design, fabricate and supply a jumper reel turntable for Acergy, for the upcoming Pyrenees subsea installation works. The turntable is pneumatically driven and met a tight schedule. Concept to supply in 23 days.
Photos of the Turntable.

Project Engineer, Gus Pugliese function testing the pneumatic drive system