Immobilis Wellhead Fatigue Management System
The solution to wellhead fatigue.- 01 Capability
- 02 Utility
- 03 Specifications
01 Capability
As BOP size and weight increase and drilling & completions operations become longer and more complex, wellhead fatigue life has come to the forefront. Whilst monitoring and FEA modelling of the fatigue in wellheads has given us a better understanding of the issues and fatigue lifeof a wellhead, the AME Immobilis WellHead Fatigue Management System (WHFMS) now allows operators to limit the cyclic loading and fatigue stresses on a wellhead during drilling, completions and workovers.
The AME WHFMS utilizes simple clump weights that can be deployed from an anchor handling vessel over the stern roller.
The ROV then connects the tether to the BOP tensioning cylinders and uses a single ROV interface panel to tension all tethers simultaneously.
02 Utility
Reduces cyclic loading on the well head, extends well head life and environmental conditions for operations and workovers
Four clump weights providing stability to the WHFMS are easily deployable and recoverable over the stern roller of an anchor handling vessel.
An ROV interface panel mounted on BOP allows all four of the tethers to be tensioned simultaneously, saving ROV operations and time.
03 Specifications
Download White PaperWant to know more?
Related Equipment
View all EquipmentBackloading Systems
For reliable backloading of large and awkward loads with minimum risk to deck personnel.
See detailsLifting Subs
Lifting subs & crossover subs available at short notice for many applications.
See details