Tension Lift Frames
AME Tension Lift Frames, or TLFs, are a modular solution to Pressure Control Equipment (PCE) rig-up during completions, flow-back, well intervention and abandonment.- 01 Capability
- 02 Utility
- 03 Specifications
01 Capability
AME Tension Lift Frames (TLF) can be used with any type of PCE requiring greater clearance and access than can be provided with standard elevator links.
The TLF allows a wide (up to 2m [78”]) working window between the elevator links (bails) for various PCE such as:
• Slickline
• Wireline
• E-Line
• Coiled Tubing
The modular solution to Pressure Control Equipment rig up.
Available in both the 350 ton and 500 ton variants, the AME Tension Lift Frame system is comprised of an Upper Spreader Beam & Lower Spreader Beam, along with a variety of modular and optional components. These include:
• PCE work platform for safer access to PCE for extended operations.
• 2x high speed hydraulic hoists complete with remote control panel and zone rated HPU- 7,000kg WLL (each) – 65 fpm (20m/min) max line speed.
• Various air operated chain hoists.
02 Utility
AME Tension Lift Frames allows addition or removal of components depending on specific campaign or well requirements.
– Individual units simplify transport and handling into drill floor and derrick.
– Optional integrated platforms to access the BOP and Pressure Control Equipment (PCE) minimise personnel fatigue by reducing exposure to extended man riding operations.
03 Specifications
Download White Paper
Want to know more?
Related Equipment
View all Equipment
AME Super Bails
The simplest solution to compensator lock-up, requiring no rig crew intervention for activation or recovery.
See details
Hose Reels
Various hose reels including grouting hoses, hydrotesting hoses and flooding hoses.
See details